August First. A lot of dirt showing!. We'll start on top. The hill at the north end of the stadium continues to be whittled down. The foundation is poured for the new steps to the top of the stadium. The top walk area of the stadium is filled and ready to be poured. Finishing touches are being applied to the inside of the team rooms, including drywall and paint. The track asphalt has been laid so it looks like a track now. 23 days to the first Freshman/JV game.
Read More
  • The steps are taking shape at the NW corner of the stadium. Where the photographer is standing will be a large plaza area near the new ticket booth and near the concession stand ( to the rear).

    The steps are taking shape at the NW corner of the stadium. Where the photographer is standing will be a large plaza area near the new ticket booth and near the concession stand ( to the rear).

  • Looking down the home side from the plaza area. To the right of the retaining wall in the foreground will be built in picnic tables and park like benches as part of the plaza.

    Looking down the home side from the plaza area. To the right of the retaining wall in the foreground will be built in picnic tables and park like benches as part of the plaza.

  • The foundation for the new steps on the NW corner of the stands. Up is to the right.

    The foundation for the new steps on the NW corner of the stands. Up is to the right.

  • Looking down the steps. The new ticket booth will be approximately where the porta-john is. All the area from the steps to the concession will be plaza.

    Looking down the steps. The new ticket booth will be approximately where the porta-john is. All the area from the steps to the concession will be plaza.

  • Looking from the press box. This will be a gentle sloped ramp to the entrance.

    Looking from the press box. This will be a gentle sloped ramp to the entrance.

  • Untitled photo
  • Untitled photo
  • Turning around from the first picture, the concession stand and rest room building has been painted and plywood removed to show the windows.

    Turning around from the first picture, the concession stand and rest room building has been painted and plywood removed to show the windows.

  • Closer view of the concession windows.

    Closer view of the concession windows.

  • Looking down the sideline and the asphalt of the new track. A rubberized surfaced will be sprayed overtop of the blacktop.

    Looking down the sideline and the asphalt of the new track. A rubberized surfaced will be sprayed overtop of the blacktop.

  • Bob-Zone. The staging area for meets at the north end of the home straight area.

    Bob-Zone. The staging area for meets at the north end of the home straight area.

  • Looking north toward the Bob-Zone.

    Looking north toward the Bob-Zone.

  • The face of the stands are complete and area between the track and stands are finished.

    The face of the stands are complete and area between the track and stands are finished.

  • Looking cock-eyed down the visitor side. The holes drilled in the blacktop will have fence posts (along the orange dotted line).

    Looking cock-eyed down the visitor side. The holes drilled in the blacktop will have fence posts (along the orange dotted line).

  • Looking from the far south end of the track looking north, showing the stone base and blacktop.

    Looking from the far south end of the track looking north, showing the stone base and blacktop.

  • The scoreboard and Panther need a coat of paint before the season to get it looking as sharp as the rest of Memorial Stadium.

    The scoreboard and Panther need a coat of paint before the season to get it looking as sharp as the rest of Memorial Stadium.

  • From behind the new goal posts down the field.

    From behind the new goal posts down the field.

  • Looking south from the press box along the back side of the stadium. Rough grading is complete. The fence will stand on top of the short retaining wall.

    Looking south from the press box along the back side of the stadium. Rough grading is complete. The fence will stand on top of the short retaining wall.

  • South end of the home stands.

    South end of the home stands.

  • Untitled photo
  • The team room building outside is nearly complete with security light and gable siding installed as well as all the doors. Nope, that is not  the new restrooms for the teams.

    The team room building outside is nearly complete with security light and gable siding installed as well as all the doors. Nope, that is not the new restrooms for the teams.

  • Untitled photo
  • Untitled photo
  • View toward the stadium from the team rooms.

    View toward the stadium from the team rooms.