June 2011
A couple of dry weeks a lot of work has been done. The stadium is starting to take shape and it will be a different shape. The main entrance and pass gate will be switched. The main ticket booth will be where the ramp was previously. As you can see the ramp and hill are being lowered significantly. Everyone will purchase tickets and DeWitt fans will turn to the left to enter the home stands up a slight ramp toward the press box or up a grand set of stairs near the north end of the seats. The new concession stand is nearly complete in the corner of the building to the left of the gate. Rest rooms have been added where the DeWitt team room used to be. One of the biggest changes is on the visitor side. Additional seating has been added and is now 10 rows of bleachers that stretch from the 5 yard line to the 5 yard line. The new visitor side has a capacity of 1,500. The home side will still have capacity of 3,200.
The team rooms at the south end of the home side is now enclosed. It will house two team rooms with restrooms, a referee locker room with shower and a trainer room.
The field is looking great and the drain lines have virtually filled in.
A waise to go. Will it be ready in time?
Read MoreThe team rooms at the south end of the home side is now enclosed. It will house two team rooms with restrooms, a referee locker room with shower and a trainer room.
The field is looking great and the drain lines have virtually filled in.
A waise to go. Will it be ready in time?